What Fremont Unified is fixing at 13 schools, campus by campus

Fremont Unified just logged 13 school projects with the state, from eight lunch shelters to a new track at American High. We mapped each campus to its neighborhood and its Houseberry school score.

AI-rendered oblique aerial view of American High School in Fremont, its worn track and field ringed by baseball diamonds and homes, with the East Bay hills behind

AI-rendered oblique aerial view of American High School in Fremont, its worn track and field ringed by baseball diamonds and homes, with the East Bay hills behind Photo: Houseberry

Eight Fremont elementary schools were in line for the same new thing this summer: a 30 by 44 foot lunch shelter over the blacktop. Fremont Unified logged all eight with the state this week, along with a track and field replacement at American High, a reroofed gym at Thornton Middle and four smaller kitchen and hallway jobs. Thirteen campuses, one state file number.

The paperwork showed up late. The notice PDFs are labeled as filed April 22 to 24, 2026, the work was scheduled for June through August, and the state's CEQA database received them on October 12 and 13, nearly six months later. If the schedule held, the shelters went up before the first bell of the fall term.

This is a story about where a school district's construction work actually lands in a city. We placed every one of the 13 campuses inside Houseberry's neighborhood boundaries and checked which neighborhoods list each school among the schools serving them. By that count, 24 of Fremont's 28 scored neighborhoods either hold one of these campuses or send students to one, according to Houseberry's Fremont school rankings. That is nearly the whole city.

Eight shelters, eight neighborhoods

Every shelter filing describes the same structure. It is a new shade roof 30 feet by 44 feet, "to serve as a lunch shelter," with minor site work, concrete infill and accessible parking, plus a restroom upgrade or an accessible drinking fountain at most sites. The Blacow notice for 40404 Sundale Drive is typical. No classrooms. No added enrollment.

Here is where each of the 13 projects sits. We matched every campus address to the Houseberry neighborhood whose boundary contains it, then pulled that neighborhood's school score from the Fremont ranking. Scores run from 0 to 5 and reflect state testing data for the schools serving each neighborhood.

SchoolWhat the filing coversHouseberry neighborhoodNeighborhood school score
John Blacow ElementaryLunch shelterSouth Sundale3.6
Joseph Azevada ElementaryLunch shelter28 Palms4.0
J. Haley Durham ElementaryLunch shelterCentral / Downtown4.1
Tom Maloney ElementaryLunch shelterGlenmoor4.1
Oliveira ElementaryLunch shelterCabrillo4.2
Joshua Chadbourne ElementaryLunch shelterMission Valley5.0
James Leitch ElementaryLunch shelterWarm Springs5.0
Fred E. Weibel ElementaryLunch shelterWeibel5.0
American HighTrack, field and fencing replacementBrookvale4.8
Thornton MiddleGym roof, multipurpose room renovationCabrillo4.2
Centerville MiddleCorridor paneling, admin buildingCenterville4.1
Washington HighWalk-in freezer and coolerCenterville4.1
Mission San Jose HighScullery and cafeteria serveryMission Valley5.0

Read down the shelter rows and the pattern is plain. Five of the eight went to campuses in neighborhoods that score below Fremont's median neighborhood school score of 4.5. Three went to neighborhoods at a perfect 5.0. The district put the identical roof on both ends of the scale in the same summer.

Bar chart of Houseberry school scores for the Fremont neighborhoods around eight new school lunch shelters
Five of Fremont Unified's eight new lunch shelters sit in neighborhoods below the city's median school score of 4.5, per Houseberry data from October 2026.

Blacow and Weibel got the same roof

John Blacow Elementary sits on Sundale Drive at Hilo Street, inside what Houseberry maps as South Sundale. Houseberry's school score for South Sundale is 3.6 out of 5, 28th of 28 in Fremont. About three miles to the southeast, Fred E. Weibel Elementary sits on South Grimmer Boulevard at Paseo Padre Parkway in Weibel, where the neighborhood school score is 5.0.

Same filing language. Same dimensions. Same June to August window.

We think that is exactly how a district should spend this kind of money. A lunch shelter will never show up in a test score. It is the roof kids on that campus eat under at noon, and Fremont Unified scheduled the 3.6 neighborhood and the 5.0 neighborhood for the same summer.

One gap in our own data: Houseberry's school listings do not yet carry a school-level score for John Blacow, James Leitch or Tom Maloney elementaries, which is why the table compares neighborhoods rather than schools.

American High's track is the one still torn up

American High sits at 36300 Fremont Boulevard at Alder Avenue, in the neighborhood Houseberry calls Brookvale, which scores 4.8 on schools and 4.5 overall. The district's notice covers removing and replacing the existing track, the field and the fencing, with accessibility upgrades, from June to about November 2026. That makes it the only one of the 13 still on the calendar.

The money is visible in the district's bid results, which bundle American with John F. Kennedy High. When bids opened on March 24, 2026, the low base bids were $4,778,000 from O.C. Jones for earthwork and paving, $513,000 from Marina Landscape for landscaping and $1,119,545 from McGuire and Hester for utilities. That is about $6.41 million across both campuses before a separate contract for installing the turf and track surface. A procurement listing for the job described it as funded entirely with local money rather than state matching grants, as Nationgraph reported.

The reach is wide. Houseberry scores American High 5.0 out of 5, and six Fremont neighborhoods list it among their schools: Ardenwood, Brookvale, Cabrillo, Centerville, Lakes and Birds and Northgate.

Thornton's $1.34 million roof

Thornton Middle, at 4357 Thornton Avenue in Cabrillo, got the largest of the summer building jobs. The filing lists a roof coating on the multipurpose room, a full new roof on the gym, new flooring, electrical work, new wall panels and interior paint.

The bid sheets from March 26 show how lopsided that job is. The low roofing bid was $892,000, just $1,000 under Diablo Roofing. Gonsalves and Stronck was the only bidder on general work and painting at $264,000. All County Flooring came in at $88,467 and Bockmon and Woody Electric at $98,380. Together that is $1,342,847, and the roof is about two thirds of it. These are opening bids, not final contract amounts.

The smaller three are easy to miss. Centerville Middle, at 37720 Fremont Boulevard, got new wall paneling on both floors of its administration building. Washington High, less than a mile up Fremont Boulevard at 38442, got an exterior walk-in freezer and cooler. Mission San Jose High, at 41717 Palm Avenue, which Houseberry's boundaries place in Mission Valley, got changes to its scullery and cafeteria serving area.

What the exemptions mean for the blocks around them

Each notice claims a categorical exemption under the state's environmental law. In plain terms the district certified that every job is a repair, a replacement or a small addition on land the school already uses. The shelter filings cite Class 14, which covers small additions to a school that do not raise capacity by more than 25 percent or ten classrooms. Every filing also cites the "common sense" exemption.

For a neighbor, that settles the questions people usually ask. No new classrooms means no change to how many students a campus can hold, so these projects give no reason to expect a longer drop-off line on Sundale Drive or Alder Avenue. Under state law, a filed exemption notice opens a 35-day window to challenge it in court.

The trade-off is timing. A resident who checks the state database learns about a summer project in October, after the concrete has cured.

The bigger work is next

These 13 jobs are the small end of the district's building program. Fremont Unified's purchasing records show it has also sought design-build teams for new construction at Leitch and Steven Millard elementaries and at Mission San Jose High, and for replacing buildings at Irvington High and Walters Middle.

The notices do not name a funding source. The district runs two voter-approved bond programs, the $650 million Measure E from 2014 and the $919 million Measure M, which passed with 64.3 percent of the vote in November 2024. The facilities office listed on every notice, at (510) 659-2559, is the place to ask which one paid for a given job.

Our earlier look at Fremont's safest neighborhoods covers how the same 28 neighborhoods compare on a different factor.

American High's new track is due around November. Until then these 13 notices are the clearest map of where Fremont Unified spent its summer, and you can see how the neighborhood around each campus scores on Houseberry's Fremont neighborhood rankings.

Sources

About the Houseberry Research Team

The Houseberry Research Team is Houseberry's reporting team: Bay Area real estate analysts, data specialists and longtime local market watchers. Every day we check the public record: building permits, city council and planning agendas, county recorder filings, state housing bills, police incident data and school results. Then we tie each story to what it means for specific neighborhoods, using Houseberry's own neighborhood data on prices, appreciation, safety, schools and amenities. Questions or corrections: Contact us.

Map of Fremont Neighborhoods

Loading map...

View Full Map

Top Neighborhoods in Fremont, CA

1st
Neighborhood Iamge
Mission San Jose, Fremont, CA
Overall Score : 4.8
Mission San Jose is one of Fremont's crown jewels, blending top-rated schools, a... See Full Page
2nd
Neighborhood Iamge
Vineyards / Avalon, Fremont, CA
Overall Score : 4.7
Vineyards/Avalon is an exclusive, high-end neighborhood in the hills of Fremont,... See Full Page
3rd
Neighborhood Iamge
Mission Hills, Fremont, CA
Overall Score : 4.6
Mission Hills is a neighborhood that exudes exclusivity, offering estate-style h... See Full Page